Self Build Glossary
Abutment - Wall rising
above the roof slope, separating roof sections.
Back to top
Airbrick - A brick with holes
to provide ventilation.
Back to top
Angle bead - Steel
strips fixed to provide a continuous guide when plastering.
Back to top
Architrave - A frame fitted around a door
or window to hide the gaps between the lining and
wall.
Back to top
Article 4 - Allows the council, in certain
circumstances, to restrict permitted development rights.
Back to top
Backland development - Development of land such
as back gardens and private open space, usually found in residential
areas. This type of land is land-locked.
Back to top
Baluster - Vertical rails supporting a handrail.
Back to top
Balustrade - Collective term including
hand-rail, baluster rails and sections of step on which they
are mounted.
Back to top
Barge boards - Fixed to the gable end of a roof
to protect the roof timbers against wet and windy weather.
Back to top
Barge foot - Additional section of timber
under or behind a barge board.
Back to top
Base slab - A raft foundation or concrete slab
under a structure.
Back to top
Bat - Usually half the normal length of a brick.
Back to top
Batt - A slab of insulation.
Back to top
Batten - Small
section of timber to which sheet materials, slates and roof tiles
are fixed.
Back to top
Block - Masonry unit, which is larger than
a brick and is designed to improve construction speed.
Back to top
Blockwork - Wall built with blocks.
Back to top
Bolster - Hardwood cap placed over a post to
increase its load-bearing capacity.
Back to top
Brandering - Battening to level
ceiling joists prior to fixing laths.
Back to top
Butt - To push or fit together.
Back to top
Buttress - Additional bracing wall or projecting
support. It is often set at right angles to the main wall and usually
tapers towards the top.
Back to top
Cant - Angle between two walls, less or greater
than a right angle.
Back to top
Cantilever - Beam fixed at one end.
Back to top
Capillary action - The
process by which the surface of a liquid in a very narrow spaces
such as porous masonry. Rising damp is created through
this action.
Back to top
Capital gains tax - Tax payable to the
Inland Revenue from the sale of property or other assets.
Back to top
Capital growth - The increase in value of a property over a period
of time.
Back to top
Capped chimney - A sealed chimney, to prevent
birds and rain getting in.
Back to top
Capstone - Coping on top of a wall.
Back to top
Carcassing - Timber used in structural sections
of a building, such as roof rafters and floor joists.
Back to top
Casement - A window hinged on one of its vertical
edges.
Back to top
Casing - Boards fixed in door openings to hide
the wall edges and support the door.
Back to top
Cavity - The gap between the
internal and external walls of a building.
Back to top
Cavity insulation - Ideally fitted when cavity
walls are built with material usually consisting of sheets of expanded
polystyrene.
Back to top
Cavity ties - Galvanised metal fixings used
to bond the external and internal structural walls together.
Back to top
Cavity tray - A damp-proof crossing the cavity
of a wall at an abutment, rising from the roof side upwards at
least 150mm before passing through the wall.
Back to top
Ceiling binder - A tie running between the joists
or trussed rafters.
Back to top
CGT - See Capital gains tax.
Back to top
Charge certificate - If there is a mortgage
on land, a charge certificate is issued instead of a 'land certificate'
by the Land Registry.
Back to top
Chase - Inscribing or cutting a groove into
brick, plaster or other material, usually so that a cable or pipe
can be embedded into it.
Back to top
Oadding - The outermost weatherproof material
fixed to a wall, designed to be decorative and/ or functional.
Back to top
Cleared site - A plot of land that is now clear
but which has previously had one or more industrial, manufacturing
or other operations conducted upon it, resulting in potential contamination
of the soil structure.
Back to top
Completion certificate - A notice issued by the
local authority after the final visit by the building inspector,
confirming that the dwelling complies with building regulations.
Back to top
Completion notice - A certificate issued by the
architect to authorise a payment to a main contractor. The completion
certificate establishes the value of retention money to be held
over a defects period and a copy can be sent with the VAT claim,
to enable this to be processed.
Back to top
Contaminated land - Land with a prior history
in which residues of toxic substances, chemical waste or manufacturing
by-products are contained within the soil structure.
Back to top
Contemporary design - Modern
materials, shapes, colours and fabrics.
Back to top
Conveyancing - The legal process involved in
buying and/ or selling land or property.
Back to top
Coping - The topmost part of a wall, often designed with a sloping
surface to throw off rainwater.
Back to top
Corbel - A projection extending to support a load above it.
Back to top
Cornice - A decorative addition to the top and projecting from
the face of an internal or external wall.
Back to top
Course - A single layer of bricks or blocks.
Back to top
Covenant - An agreement to do or not do something
contained in a deed. Covenants can be made by the current or any
prior owner of the land, for example to maintain boundary walls
or fences.
Back to top
Coving. The concave decorative moulding that joins a ceiling to
the walls.
Back to top
Curtilage - A small area forming part of, or parcel with, the dwelling
that it contains or is attached to.
Back to top
Dado - Panels fixed to the lower half of internal walls.
Back to top
Dado rail - Decorative and/ or functional rails, usually made from
moulded timber, fitted traditionally to internal walls to protect
them from damage by chairs.
Back to top
Damp-proof course - A waterproof membrane installed in walls and
floors to pre- vent moisture causing damage by rising upwards through
the structure. Also termed 'damp course' or 'DPC'.
Back to top
DPC - The standard and widely used abbreviation for damp-proof
course.
Back to top
Dry joint - A brick or timber joint that is not bonded with mortar
or adhesive.
Back to top
Dry lined - An internal partition or cladding constructed usually
with a timber frame and plasterboard.
Back to top
Ducting - A system of shafts or tubes designed to carry and protect
cables or pipes.
Back to top
Dwarf wall - A low wall, for example one constructed to support joists under the ground floor.
Easement - A legal right to use or cross over land owned by someone
else.
Back to top
Eaves - The lowest section of a roof, overhanging a supporting
wall.
Back to top
English bond - A particularly strong method of building walls by
laying bricks together in staggered alternating courses using headers
and stretchers.
Back to top
Escutcheon - A protective plate around a keyhole or door handle.
Back to top
Fascia - Boards installed to a roof to protect the ends of trusses
or rafters and on which gutters are attached.
Back to top
Finial - Ornamental timber section added to the highest point of
barge boards or hanging from stair newels on landings.
Back to top
Flange - A flat plate at the end of a pipe or
beam, through which a bolted joint can be made.
Back to top
Flashing - Waterproof material covering joints between walls and
roofs, usually shaped out of lead.
Back to top
Floating coat - The first coat of thick plaster put on a wall to
cover irregularities.
Back to top
Floor plate - A plate constructed from steel or timber bedded in
mortar and designed to withstand heavy loads.
Back to top
Footings - The foundations of a structure.
Back to top
Footprint - The 'footprint' of the building refers to those parts
within the external walls.
Back to top
Formwork. Temporary boards used to keep wet mixtures,
such as concrete, in a particular shape until it sets.
Back to top
Framed construction - A structure built with a strong skeleton
frame made of timber or steel, against which a brick outer shell
is added.
Back to top
Freehold - Property held until the end of time.
Back to top
Gable - Triangular upper part of a wall at the end of a ridged
roof.
Back to top
Gable end - The gable shaped canopy over a door or window or a
wall topped with a gable.
Back to top
Hard landscaping - Elements include paths, driveways, garden walls and patios.
Header - Brick or block laid across a wall
to bond together its two sides. It also means the exposed end part
of a brick.
Back to top
Herringbone strutting - The type of cross bracing used between
floor joists to increase stiffness.
Back to top
Hip - The sharp edge of a roof from ridge to eaves where the two
sides meet.
Back to top
Hipped roof - A roof with sloping ends instead of vertical ones.
Back to top
Infill site - The redevelopment of land that has adjacent buildings,
for example along a row of terraced houses where one has been demolished
or where a gap always existed.
Back to top
Jamb - Vertical side post of a window or doorway.
Back to top
Joist - A beam that supports a ceiling or floor.
Back to top
Joist hanger - A fabricated metal slot installed in a wall to keep
a joist securely in position.
Back to top
Kite. The kite-shaped tread mostly used where stairs turn a comer.
Back to top
Land bank - A supply of potential development plots purchased and
retained by builders, which allows them to trade and construct
on a continuous basis by moving on to the next plot as completion
occurs on the current one.
Back to top
Land certificate. A document issued by the Land Registry giving
details of who owns the land. However, a land certificate should
not be accepted as absolute proof of ownership as it may be out
of date. 'Office copy entries' are accepted by solicitors to prove
ownership.
Back to top
Land-locked - A plot of land with no independent route providing
access onto it and no obvious means of creating one. Examples include
surplus areas of an owner's private garden.
Back to top
Lath - A long slender piece of economical timber.
Back to top
Lath and plaster - Old-fashioned method of plastering
a wall or ceiling using slender timbers to construct a narrow
gauge frame as a base for the wet plaster.
Back to top
Leaf - The inner or outer wall of a cavity wall construction.
Back to top
Leasehold - Land ownership restricted to a number of years and
with conditions written in a lease.
Back to top
Line-boards - Timber boards laid on the ground and used to mark
out the widths and position of inner and outer walls and the foundations
(setting-out), prior to excavating.
Back to top
Lintel. Horizontal section of timber, concrete or metal, installed to the top of a door- way or window opening, designed to support the structure above.
Massing - The outline of a dwelling's external shape and form.
Back to top
Mullion - The vertical sections of material that divide a window
frame into smaller lights.
Back to top
Newel - The main post supporting the end of a balustrade.
Back to top
Nog - A wooden peg.
Back to top
Nogging. Short cross-pieces of timber used to brace studs.
Back to top
Nose - The extending front edge of a staircase step.
Back to top
Office copy entries - Copies of the entries recorded at the Land
Registry proving ownership.
Back to top
Over-building - The term applies to building
a structure that is inconsistent in size, quality and/ or style
with other buildings nearby or has excessively filled the limited
amount of land space available. Also known as an 'over development'.
Back to top
P.A.R - Common abbreviation for 'planed all round'. Pane. A sheet
of glass usually framed with timber.
Back to top
Party wall - A wall shared between two properties, such as is the
case with semi-detached houses.
Back to top
Pile. A deep foundation. These are formed by creating a hole deep
enough to locate solid sub-soil. The hole is usually filled with
concrete and reinforced or a section of solid steel is installed.
Back to top
Pink land. Land with a 'residential use class'. The term is used
largely by local authority planners and originates from the ink
colour used to identify residential development areas on maps and
plans.
Back to top
Pitch - The angle or slope of a roof or staircase.
Back to top
Planning permission - Authority granted by the local council for
land to be developed or additions made to an existing property,
usually with certain conditions attached.
Back to top
Plate - A length of timber or steel placed either on top of a wall
to support the roof trusses (a wall plate) or fixed to a floor
so that studs or a timber-framed partition can be installed (a
floor plate).
Back to top
Precast concrete - Concrete components cast in a factory or on
site prior to being placed in their final positions.
Back to top
Profile boards - Boards of about a metre long
used to transfer the plan outline of a building onto the ground.
They are held securely in place by timber stakes. Lines are stretched
between saw-cuts or marks, so the position of a wall can be fixed.
Back to top
Property register - One of the three parts of a land or charge
certificate describing the property and rights associated with
it.
Back to top
Purlin - Positioned half-way up the slope of a roof, purlins are
timber beams installed to support the rafters.
Back to top
Raft - A firm slab, usually made from concrete, designed to spread
the weight of a structure on soft ground.
Back to top
Rafter - Timbers that form the main part of the roof frame going
from the wall plate up to the ridge.
Back to top
Ranging rod - Section of timber marked to identify
the position of brick and block courses or any other part of the
construction - basically a measuring stick.
Back to top
Ransom strip - A small strip or area of land
needed to be crossed to access to the building
land. The land is owned by a third party who will demand
money to allow access over the strip or for its purchase.
Back to top
Reinforced concrete - A process of installing steel rods inside
concrete beams to help them withstand stress along their length
without collapsing.
Back to top
Reject - Materials that do not come up to the required standard,
for example, 'reject engineering brick'.
Back to top
Reserved matters - The fine detail required
following approval of outline planning permission. The aspects
include design, layout, access, orientation and landscaping of
the dwelling.
Back to top
Retrospective design - An interior scheme that reflects the immediate
past and uses colours, materials and objects pertinent to that
period.
Back to top
Ridge - The topmost line of the roof.
Back to top
Ridge tile - Preformed angled tile covering the apex of the roof.
Back to top
Roll-over relief - A way of delaying the payment of capital gains
tax by reinvesting profit from the sale of one business asset to
another.
Back to top
Sarking - Boards placed between the rafters and the roof (sometimes
called the 'soffit').
Back to top
Screed - A thin level layer of material usually applied to floors.
Back to top
Section 106 agreement - A binding agreement regarding matters linked
to the pro- posed development, made between the council and a developer
when planning permission is granted.
Back to top
Septic tank - A tank constructed or manufactured to accept sewerage
when no mains system is available.
Back to top
Setting-out - The use of profile line-boards to mark a plan on
the ground.
Back to top
Signing off - Formal completion of the dwelling.
Back to top
Sleeper wall - A wall to support the ground floor,
usually honeycombed in construction to provide ventilation.
Back to top
Snagging - When a builder attends the site to resolve outstanding
matters after the main construction has been completed.
Back to top
Snow line - Considered to be 500 feet above sea level. It is the
theoretical altitude at which land is expected to suffer from severe
winter conditions.
Back to top
Soffit - The underside of an architectural element, for example
an arch or the eaves.
Back to top
Soft landscaping - Topsoil,
plants, shrubs and trees.
Back to top
Soleplate - A substantial horizontal section of timber or metal,
fixed to the floor slab.
Back to top
Staged loan - The total sum is released
in several predetermined stages, as the construction proceeds.
Payment is made either prior to a stage being reached (e.g. when
foundations are going to be installed) or afterwards.
Back to top
Stamp duty - A duty payable on certain documents involved in the
transfer of land and property ownership. The liability falls on
the buyer.
Back to top
Stanchion - A vertical supporting beam usually
made from steel.
Back to top
Stretcher - Brick or block laid lengthways in a
wall.
Back to top
String or stringer - One of the parallel boards supporting the
treads.
Back to top
Structural indemnity insurance - Insurance policy
usually required by mortgage lenders that guarantees the dwelling
against structural defects for a specified term after completion.
Back to top
Staged mortgage - Mortgage for self-builders
- funds are released in stages (usually between three and
seven) as the house is constructed.
Back to top
Strip foundation - Concrete filled trenches to support a building.
Back to top
Strut - An upright roof timber connected to the rafter above it
or sloping to connect another post to the rafter.
Back to top
Tabling - The term used when roof verges are capped with stone
slabs.
Back to top
Tanalised timber - Timbers used in construction, typically for
floor joists, which have had tanalith-oxide preservative driven
into their cellular structure under pressure.
Back to top
Tandem garage - A garage long enough for two vehicles to park one
behind the other.
Back to top
Taper relief - A sliding-scale allowance for capital gains tax
available from April 1998 based on the principle that the longer
a property is owned the less tax is payable.
Back to top
Tie-beam - The main horizontal roof beam just above the wall that
connects the bases of rafters.
Back to top
Title deeds - Legal documents proving ownership of a property.
Back to top
Trussed - Timber planks framed together to bridge a space.
Back to top
Tree preservation order - Made under the Town and Country Planning
Act 1990 by the local planning authority to protect trees of importance
for amenity, landscape and nature conservation.
Back to top
Turnkey - A self-build 'turnkey project' is one
that is entirely managed by an individual or a company (such as
an architect or timber frame company), with your own involvement
limited to providing funds and design guidelines.
Back to top
Underpinning - The installation of strong foundations underneath
primary foundations when the latter have failed or have been found
to be inadequate to support the structure above.
Back to top
UPVC - A type of stable plastic used in the manufacture of double-glazed
window frames, doors and cladding.
Back to top
Use class - Designation of land use by the
local authority, for example as 'residential'. The 'use class'
determines how specific plots of land can be developed, if at all.
Back to top
Vendor - The person selling land or property.
Back to top
Verge - The edge of a roof at the gable.
Back to top
Wall tie - A galvanised metal tie used to bond the inner and outer
walls of a cavity wall together.
Back to top
Winders - Triangular stair treads sometimes used when a staircase
turns a comer.
Back to top
Yield. The annual return on property investment expressed as a
percentage.
Back to top